Rubis Energy Uganda Limited has won a USD17,296,320.5 tender to supply Heavy Fuel Oil (HFO) for the Namanve Thermal Power Plant. The plant is run by Uganda Electricity Generation Company…
Rubis Energy Uganda wins a USD17.3 mn deal to supply heavy fuel oil to UEGCL’s Namanve thermal power plant
