Eskom commissions UGX 500 million compressed air system at Nalubaale Power Station Muhereza Kyamutetera 4 years ago Filbert Kinyanda, the Technical Director of API Technical Services (left) hands over operators manuals for the newly installed Nalubaale Power Station Compressed Air System to Thozama Gangi, the Eskom Uganda Managing Director (2nd right). Looking on is Feni Luvuyo (right) and Jamidu Sentamu (2nd left) the Eskom Technical Director and Project Engineer respectively. This Is Premium Content. Subscribe And Save On Unlimited Access With Our Best Offers! Subscribe Log In